Creating Customers for Life™

"Truly caring about the quality of work and the impact that work has on the customer."
"Honest, Professional & Efficient."
"Highly professional customer-centric organization."
"High manufacturing quality, flexibility, qualified people."
"Attention is given to all details."
"Excellent people, shop, quality, and on-time deliveries."
"They do excellent work and stand behind it if there is an issue."
"When bringing Bassett on-site, I never have a worry about the workmanship and professionalism that is displayed. A great, worry-free contractor!"
"My experiences with Bassett have been very positive. When bringing Bassett onsite, I never have a worry about the workmanship and professionalism that is displayed. A great worry free contractor!" -McCain Foods"

Project Spotlight: Expansion to Corporate Production Facility

WE LISTEN

The customer needed to add 5 new packaging lines to their existing corporate production facility.

WE DISCOVER

To accomplish this goal, we installed 7 low charge refrigeration packaged penthouse units and 14 penthouse and CPA air handlers on the rooftop of their new production facility. This would give the customer the capacity they needed to expand their production and meet their goals.

WE LOOK AHEAD

These low charge refrigeration packaged penthouse units are an exciting new technology and a first-time installation for this customer. On typical ammonia refrigeration projects, you will find an engine room inside the facility with ammonia piping running out to the rooftop unit. These new packaged units include the engine room with the condenser unit on the rooftop. This safe and effective solution means minimal ammonia piping running on top of the facility’s roof and in turn, less ammonia on site.

WE DELIVER FULL-SERVICE SOLUTIONS

Our full-service solutions on this project included Industrial Refrigeration, Metal Fabrication, HVAC Controls, and Service.

WE ARE CREATING CUSTOMERS FOR LIFE™

This project took place for a customer facility located in Ohio. The customer was expanding its corporate production facility and was in need of 5 new packaging lines.

We were chosen for this project based on our strong relationships, reputation for independence, and the ability to provide quality solutions without oversite.

Placement of these units were 290 feet from the side of the building at their longest point. Typically a helicopter-type solution would be used for such a long distance, however these 30,000 lb. units were placed with the use of a 500-ton crane. This crane had a boom that was 413 feet long and weighed 1 million lbs. The load required 474,000 lbs. of counterweights to be added. Truly a sight to see, this crane took 1 week to set up on-site and was transported on 30 semi-trucks.

Because the type of units being installed required minimal onsite rooftop piping to be run to and from the units, the installation time was minimal. Installation took approximately 2 days per unit; one day for placement of the unit and one day for the interconnecting piping. The entire project ultimately included 45 separate pieces of equipment to be placed and the project was completed in approximately 4 months.

  • Text to Join!

  • Sign up for our E-Newsletter!

    Subscribe to The Bassett Blueprint our quarterly email newsletter list. 


    By submitting this form, you are consenting to receive marketing emails from: Bassett Mechanical, 1215 Hyland Avenue, Kaukauna, WI, 54130, http://www.bassettmechanical.com. You can revoke your consent to receive emails at any time by using the SafeUnsubscribe® link, found at the bottom of every email. Emails are serviced by Constant Contact
  • Recent Posts

  • Archives

  • © Bassett Mechanical 2020 Privacy Policy
    Linc Service IIAR RETA Food and Beverage Wisconsin Wisconsin Cheese Makers Association ASHRAE AGC USGBC ISO 9000